Water Supply Management System

  • Long-term and short-term prediction based on past measurement data, climate, and weather factors for each water supply area.
  • Water purification production and drainage supply through production prediction.
  • Derivation of optimal pump operation considering changes in pump state and efficiency by workplace.
  • Analysis and estimation of drainage patterns by hour based on past drainage by water supply area.
  • Establishment of a drainage operation plan using daily drainage and hourly predicted values, land level, and electricity rates by time.

Main function

Production forecasting setting
  • Selection of prediction target area and application algorithm.
  • Setting prediction algorithm parameters.
  • Whether to execute the study mode, apply the prediction result, and set a special day.
  • Recent execution information inquiry function.
Supply data check
  • Check the supply patterns by branch, daily, and day of the week.
  • Performance multiple analysis results and pattern inquiry for prediction performance.
Production forecast data analysis
  • Estimation of production volume by branch and period.
  • Inquiry and comparison of results by production prediction algorithm.
  • Calculation and inquiry of the error of the predicted value of water production.
    – Average error value by day and time.
Real-time pump operation results
  • Comparative analysis of the number of pumps operated by time.
  • Actual operation results and pump operation schedule predicted values.
  • Establishment of groups by pump number and capacity at the target workplace.
Power bill simulation
  • Simulation of electricity bills by pump operation schedule.
  • Reflecting the measured value of the flow rate, unit price, index conditions, etc.